Tribology Laboratory

people
research
facilities
publications


Courses

syllabuses
office hours
homework
Bulletin Board


Contact

Office
e-mail
mailing address
driving directions


Glossary

Links


Return to Message Board

Original Message
Posted by Brandon Krick on April 02, 19108 at 17:42:54:

There was a slight mixup on the grade sheet for report 2 grades:

The number for the standard parts is actually the Cost analysis/assembly time.

The number for the Manufactured/Injection Molded was actually the standard parts.

The number for the Cost Analysis/Assembly Time was actually the Manufactured/Injection Molded section.

I appologize for the mixup. Many groups were wondering why they got low grades in the manufacturing/injection molded section. They were actually the standard parts section.

Brandon


Responses to Message:

Respond to Message

name
email address
subject