| Final Exam: Answer to question 3 |
 |
| In order to improve drainage, a golf course contractor must
amend a fairway with three inches of sand, rototilled to a total depth after amending of
12 inches. How many tons of sand will be needed, assuming a bulk density of 1.5 (the same
as the present soil), to treat a four acre fairway in this manner?
|
|
|
|
|